Aledo Middle School Renovation/Expansion

  • Based on demographic projections, Aledo Middle School will exceed maximum student capacity in one year (2020-2021). The Bearcat Growth Committee addressed the enrollment growth and capacity at the middle school level by building a bond package that includes a new Middle School #2 and a large-scale renovation/expansion of the current Aledo Middle School.

    Renovations to Aledo Middle School will include a new library, fine arts wing, gym, field house and new cafeteria space. Aledo ISD will shift to a 6th-8th grade configuration at the middle school level. Currently, McAnally Intermediate serves all Aledo ISD 6th grade students.

    Aledo Middle School originally opened in 1967 as a high school and middle school. It became AMS after the current high school was built in 2000 and the front wing addition opened in 2002.

    Scope of Work

    • Architect: Huckabee
    • Grade-level 6-8th Academic Wings (1,200 student capacity)
    • Reuse of front 2002 wing (with renovations), multi-purpose center (gym), stadium
    • Fine Arts Wing
    • Cafeteria space renovation
    • Fieldhouse replacement
    • Cost $33,446,000


    Tentative Project Schedule
    Design: January 2020-October 2020
    Procurement: November 2020-December 2020
    Construction: January 2020-June 2022
    School opens: August 2022
    Grades Served: Grades 6-8th