Aledo Middle School Renovation/Expansion

  • school concept

    Based on demographic projections, Aledo Middle School will exceed maximum student capacity in one year (2020-2021). The Bearcat Growth Committee addressed the enrollment growth and capacity at the middle school level by proposing a bond package to include a new Middle School #2 and a large-scale renovation/expansion of the current Aledo Middle School.

    Renovations to Aledo Middle School would include a new library, fine arts wing, gym, field house and new cafeteria space. The bond proposal is based on a new 6th-8th grade configuration at the middle school level. Currently, McAnally Intermediate serves all Aledo ISD 6th grade students.

    Aledo Middle School originally opened in 1967 as a high school and middle school. It became AMS after the current high school was built in 2000 and the front wing addition opened in 2002.

    AMS Renovation/Expansion - $33,446,000
    Student capacity 1,200
    Grades: 6th, 7th, 8th
    Square footage: 169,000
    Location: 416 FM 1187 South Aledo
    Projected open: Fall 2022

    School notables
    -View Aledo Middle School floor plan
    -Grade-level academic wings for 6th, 7th, and 8th
    -Reuse of front 2002 wing (with renovations), multi-purpose center (gym), stadium
    -Renovation for cafeteria space
    -New library, new fine arts wing, new gym, new field house